Monday, July 13, 2009

proposal

Lower Secondary Science Research Project
Proposal Form


Group Name: _____Brainiac Class: __1E_________

Name of Members and Signatures:
1) Eugenia Tan
2) Muhammad Idafi
K 3) Kevin loo
4) Faridzuan
5)
Project Title:

biology

Problem Question:

What condition effect the ripening of fruit?



Hypothesis:
It will ripe in 5 days.



Web-Address (Url) of Project Blog:


http://sciencebrainiac-1e.blogspot.com/


Expected date of research completion: july


Project Mentor and Signature:


Apparatus and Materials Needed:

18 bananas
3 zip log bag &18 containers
Not cook rice.




Experimental Procedure Setup:
Set the apparatus.
Then make sure each experiment have three attempts.
Box1:banana covered with rice
Box2:banana left in the open
Box3:banana in zip lock bag place in a container filled with water
Box4:banana place in fridge
Box5:banana place in dark place
box6:banana wrap in brown paper
Leave the experiment for at least 5 days
Check the experiment every day.






Independent Variable: bananas must be the same colors and size.

Dependent Variable: must be place at the same place.

Controlled Variables (Constants):
It must be check every day to make the experiment fare.

Wednesday, June 17, 2009

conclusion of banana after 5 days

Attempt1:

Box1:yellow
Box2:yellow+green pigment
Box3:fail
Box4:green+black spots
Box5:yellow+green pigment
Box6:yellow+green pigment


Attempt2:

Box1:yellow
Box2:yellow+green pigment
Box3:green
Box4:green+black spots
Box5:yellow+green pigment
Box6:yellow+green pigment


Attempt3:

Box1:yellow+green pigment
Box2:yellow+green pigment
Box3:fail
Box4:green+black spots
Box5:yellow+green pigment
Box6:yellow

Saturday, June 13, 2009

condition of banana

Box1:banana covered with rice
Box2:banana left in the open
Box3:banana in zip lock bag place in a container filled with water
Box4:banana place in fridge
Box5:banana place in dark place
box6:banana wrap in brown paper

hypothesis

Box1:ripe the fastest
Box2:ripe in three days
Box3:will not ripe but rot
Box4:will turn black
Box5:ripe in 5days
Box6:ripe in a week

first day of project

our project start on monday 8 June 2009. we have three attempt to ensure the experiment is accurate and reliable.

Friday, April 24, 2009

Group Members and proposal information

LEADER:EUGENIA TAN
MEMBER:MUHD IDAFI
MEMBER:KEVIN LOO
MEMBER:MUHD FARIDZUAN